Start learning 50% faster. Sign in now
2A, 3C, 5F, 7J, 11O The first number in each pair is a prime number (2, 3, 5, 7, 11), and the second letter seems to be alphabetically ordered (A, C, F, J, O). If we continue this pattern, the next prime number after 11 is 13, and the next letter in the alphabet after O is U. So, the next term in the series should be 13U. Therefore, the correct option is: 13U
In a triangle ABC, angle A = 45 degrees, angle B = 60 degrees, and side a = 10 units. Find the length of side b.
38.182 - ? - 27.122 = 25.892
‘D’ and ‘E’ can complete a project in 40 days, while ‘E’ and ‘F’ can complete it in 60 days. ‘D’ and ‘E’ worked together on it f...
Alloy A contains iron and copper in ratio 4:5. Alloy B contains iron and copper in ratio 3: 4. If 63kg of alloy A and 56 kg of alloy B are mixed, then w...
A, B and C alone can complete a work in 20, 30 and 25 days respectively. All of them started working together but after 4 days from start A left the job...
Find the smallest number which when successively divided by 4, 7 and 5 will give the remainder 2, 1, 3.
A train overtakes a bus traveling at a speed of 5 m/s in 8 seconds. If the length of the train is 160 meters, determine the speed...
If a + b + c = 0, then what is the value of a3 + b3 + c3 - 3abc?
Cost of two types of pulses is Rs.18 and Rs, 23 per kg, respectively. If both the pulses are mixed together in the ratio 2:3, then what should be the pr...
(0.25) -1.5 = ?