The efficiency of P, Q, R, S are in the ratio of 6:5:4:3. If P and R can do a work together in 6 days. Then How many days Q and S will take to complete the same work?
Efficiency of (P+R) = (6+4) = 10 Days taken by (P + R) together to complete the work = 6 days Efficiency of (Q + S) = (5+3) = 8 So, Q and S will take time = (Total days of (P + R) × Total Efficiency of (P + R)) / (Total Efficiency of (Q + S)) = (6 ×10)/8 = 60/8 = 7(1/2) days
Which of the following is NOT a non-contact force?
Which of the following is a reason for excessive current in electrical circuits?
I. Direct touching of wires
II. Connection of many d...
The rate of transfer of charges through a circuit is called?
A porter lifts luggage of 20 kg from the ground and puts it on his head 2 m above the ground. Calculate the work done by him on the luggage (take g = 10...
In order to investigate the internal atomic structure of crystals, we make use of:
The ratio of the amplitudes of the electric field and magnetic field strengths has the same dimensions as that of:
Lux is the SI unit of -
Which of the following is caused due to the Newton’s first law of motion?
I. When a motorcar makes a sharp turn at a high speed, we tend to ...
Which of the following is the ultimate source of energy?
The part of the eye having the largest refractive index is -