Question
The efficiency of P, Q, R, S are in the ratio of
6:5:4:3. If P and R can do a work together in 6 days. Then How many days Q and S will take to complete the same work?Solution
Efficiency of (P+R) = (6+4) = 10 Days taken by (P + R) together to complete the work = 6 days Efficiency of (Q + S) = (5+3) = 8 So, Q and S will take time = (Total days of (P + R) × Total Efficiency of (P + R)) / (Total Efficiency of (Q + S)) = (6 ×10)/8 = 60/8 = 7(1/2) days
If x + y + z = 20, x² + Y² + z² = 160 and x z = y², then find the value of x z?
if a2 + b2 + c2Â =Â 2(3a -5b -6c)-70 , then a-b-c = ?
If sin 28° = 15/17 , then tan 62° = ?
If ab = -15 and (a2 + b2) = 34, then find the value of (a – b).
(123×123×123 + 130×130×130)/(123×123 - 123×130 + 130×130) = ?Â
 = ?
(√ (sec2 θ + cosec2 θ )) ((sinθ (1 + cosθ ))/(1 + cos&thet...
If z + (1/z) = 2 then find z105 + 1/(z105) = ?
- If (x + y + z) = 14 and (xy + yz + zx) = 50, then find the value of (x² + y² + z²).
- If [4a - (1/2a)] = 6, then find the value of [16a² + (1/4a²) - 8]