Question
'A' and 'B' can do a piece of work together in 30 days.
They worked together for 18 days, and then left the work. The remaining job was finished by 'C' alone in 12 days. How many days would 'C' alone take to finish 72% of the whole work?Solution
ATQ,
Fraction of work done by 'A' and 'B' = 18 / 30 = 3/5 Fraction of work done by 'C' = 1 - 3/5 = 2/5 So, number of days taken by 'C' alone to complete the entire work = 12 ÷ (2/5) = 30 days So, time taken by 'C' to complete 72% of the work = 30 × 0.72 = 21.6 days
Who first proposed the boycott of British goods during the Swadeshi Movement?
Consider the following statements about Speaker:
1. Speaker steps out of his office immediately after house is dissolved
2. Speaker o...
Which one of the following does not figure in the list of languages in the Eighth Schedule of the Constitution of India?
Python: Programming Language :: Tiger: ?
A train travelling with a speed of 108 km/h can cross a pole in 5 seconds. Find the time taken by the train to cross a 210 metres long platform if the s...
What is the area of an equilateral triangle whose each side is 14 cm long?
Among the four works mentioned below which one is encyclopaedic in nature?
Which of the following statements about the “Integrated Ombudsman Scheme” is correct?
I. The Scheme was ...
A printer uses a total number of 4893 digits in order to number all the pages of his book. He starts with the digit 1 for the first page of the book. H...
Which of the following statement/s is/are correct regarding Securities and exchange board of India?
I. It wa...