Question
Alok finishes 60% of a project in 30 days, while Neha
finishes 20% of the same in 15 days. Alok worked for 25 days and then stopped. Find the time taken by Neha to complete the remaining project.Solution
ATQ,
Alok’s total time = 30 / 0.60 = 50 days
Neha’s total time = 15 / 0.20 = 75 days
Total work = LCM(50, 75) = 150 units
Efficiency of Alok = 150 / 50 = 3 units/day
Efficiency of Neha = 150 / 75 = 2 units/day
Work done by Alok = 25 × 3 = 75 units
Remaining work = 150 - 75 = 75 units
Time by Neha = 75 / 2 = 37.5 days
Cambodia's' Phnom Penh '(Namnpeh)' is situated on the banks of which river?
The pillar-like structures which hang vertically downward from the aerial branches found in banyan tree are known as
Methyl ethyl ketone is also known as:
The sex of a child is determined by the
In which state is the famous Kamakhya Temple situated?
The Insurance Amendment Bill 2021 proposes an increase in the foreign direct investment (FDI) limit in the insurance sector. What is the proposed incre...
The term ‘Systematic Withdrawal Plan (SWP)’ is related to ________?
In which of the following states is the Nrityagram, an Odissi dance institution, located?
Who was felicitated with the 54th  Jnanpith Award for his “outstanding contribution to the enrichment of Indian Literature in English?
El Nino is