Question
Vikas does 65% of a job in 39 days, while Suman does 40% in
40 days. Vikas worked for 18 days and left. Calculate how many days Suman would need to wrap up the remaining task.Solution
ATQ,
Vikas’ full-time = 39 / 0.65 = 60 days
Suman’s full-time = 40 / 0.40 = 100 days
Total work = LCM(60, 100) = 300 units
Vikas’ efficiency = 300 / 60 = 5 units/day
Suman’s efficiency = 300 / 100 = 3 units/day
Work done by Vikas = 18 × 5 = 90 units
Remaining work = 300 - 90 = 210 units
Time by Suman = 210 / 3 = 70 days
Solve the quadratic equations and determine the relation between x and y:
Equation 1: 103x² - 470x + 367 = 0
Equation 2: 107y² - 504y + 397 = 0
Solve the quadratic equations and determine the relation between x and y:
Equation 1: x² - 36x + 288 = 0
Equation 2: y² - 36y + 320 = 0
In the question, two equations I and II are given. You have to solve both the equations to establish the correct relation between x and y.
I. x
If ‘y1’ and ‘y2’ are the roots of quadratic equation 5y2 – 25y + 15 = 0, then find the quadratic equation whose roots are ‘3y1�...
If 3x – 2y = 10 and xy = 11, the value of 27x³ – 8y³ is __________.
I. 2x² - 15x + 27 = 0
II. 2y² - 13y + 20 = 0
If x^2 - 7x + k = 0 has roots that are equal, what is the value of k?
Solve the quadratic equations and determine the relation between x and y:
Equation 1: x² - 34x + 288 = 0
Equation 2: y² - 29y + 210 = 0
I. 20x² - 93x + 108 = 0
II.72y² - 47y - 144 = 0
I. 20y² - 13y + 2 = 0
II. 6x² - 25x + 14 = 0