Question
A group of 36 boys works 13 hours per day and completes
37.5% of a task in 20 days. After these 20 days, 'X' boys leave the job. The remaining boys continue the work, now putting in 15 hours per day, and finish the rest of the task in 52 days. If a team of (5X) boys works 12 hours per day, how many days will they take to complete the entire task on their own?Solution
ATQ,
36 * 13 * 20/(37.5/100) = (36 – X) * 15 * 52/((100 – 37.5)/100)
12 * 8/3 = (36 – X) * 100/62.5
X = 36 – 20 = 16
Let the number of days in which 5X boys complete the whole work be 'n' days.
36 * 13 * 20/(37.5/100) = (5 * 16) * 12 * n
n = 26
Find the circumference and area of a circle of radius 7 cm. Take π = 22/7.
The base of the triangular area is two times its height. If the cost of farming area is Rs. 2000 and Rs. 80 per hectare. Find its base (1 hectare = ...
The breadth of a rectangle is increased by 9 cm, it will become twice the length of the rectangle. If the new perimeter is 294 cm, then find the origina...
Two wires A and B are made of the same material and have the same length but different cross-sectional areas. If the resistance of wire A is 9 times the...
The cost of fencing a rectangular field at the rate of Rs. 5/metre is Rs. 350. If the length of the field is 11 metres more than its breadth, then find ...
In a rectangular floor of length and breadth of 19 metres and 6 metres, respectively, square tiles each of 2 metre edge length are to be laid. If the co...
The perimeter of an equilateral triangle is 36√3 cm. Find its height.
The volume of a cuboid is 480 cubic cm. If its length is 10 cm and breadth is 8 cm, find its height.
Find the length of a wire radius 0.40 cm which can completely cover the surface of a cylinder whose height is 1.6m and base radius 21 cm?
A wire, when bent in the form of a square encloses an area of 121 sq. cm. If the same wire is bent in the form of a circle, what is the area enclosed by...