Question
A and B can complete a piece of work in 12 days and 15
days respectively. They start working together, but after 4 days, A leaves. In how many more days will B complete the remaining work?Solution
Work done by A and B in 1 day = (1/12 + 1/15) = 5/60 + 4/60 = 9/60 = 3/20. Work completed by A and B together in 4 days = 4 * (3/20) = 12/20 = 3/5. Remaining work = 1 - 3/5 = 2/5. Work done by B in 1 day = 1/15. Time taken by B to complete 2/5 of the work = (2/5) ÷ (1/15) = (2/5) * 15 = 6 days. Correct Option: a
If tan A = 1 and tan B = √ 3, what is the value of cos A . cos B - sin A . sin B?
A ladder leans against a wall. The foot of the ladder is 6 meters away from the wall. If the angle the ladder makes with the ground is 60°, find the le...
Find the value of sin265o + sin225o + cos235o + cos255o.
...If sin θ + cos θ = 1.2, find the value of sin θ. cos θ.
- In a triangle ABC, if 5∠A = 3∠B = 15∠C, then find the value of cosA + sin(C + 10 ° )
Find the value of tan(75°) using the identity for tan(A+B).
(cos5°+sin5°)/(cos5°-sin5°) is equal to:
Two points P and Q are at the distance of x and y (where y > x) respectively from the base of a building and on a straight line. If the angles of elevat...
The minimum value of 3 sin2 θ + 4 cos2 θ is
...