Question
A and B can complete a piece of work in 12 days and 15
days respectively. They start working together, but after 4 days, A leaves. In how many more days will B complete the remaining work?Solution
Work done by A and B in 1 day = (1/12 + 1/15) = 5/60 + 4/60 = 9/60 = 3/20. Work completed by A and B together in 4 days = 4 * (3/20) = 12/20 = 3/5. Remaining work = 1 - 3/5 = 2/5. Work done by B in 1 day = 1/15. Time taken by B to complete 2/5 of the work = (2/5) ÷ (1/15) = (2/5) * 15 = 6 days. Correct Option: a
In the given sentence, three words are marked as (A), (B), and (C). These words may or may not be placed in their right places. Four options with diffe...
In each of the following question, a sentence is given with four words marked as (A), (B), (C) and (D). These words may or maybe not placed at their co...
- In each of the questions given below, four words are given in bold. These four words may or may not be in their correct position. The sentence is then foll...
The conference is to be starting at 09:30 a.m. with the introductory speech by the minister.
Congregating (A) to concerns regarding choose (B) of food and water as well as owing (C) in large numbers, the authorities said that some schools might...
- In the question given below, four words are given in bold. These four words may or may not be in their correct position. The sentence is then followed by o...
In the question below, two sentences are given and each of them consists of two words highlighted in bold. The words may be incorrectly placed and need...
In response, the unions called off the mass memorial service that was originally scheduled last year.
In the questions given below, four words are given in bold. These four words may or may not be in their correct position. The sentence is then followed...
In the question given below, four words are given in bold. These four words may or may not be in their correct position. The sentence is then followed...