"A" can complete a task in 15 days, while it takes 25
days for "B" to complete the same task. The ratio of the efficiencies of "A" and "C" is 2:1. If a task takes 30 days for 2A, 3B, and 4C working together, find out the number of tasks that were achieved.Solution
ATQ, Let the total number of task achieved be ‘a’ and each Task are of 300b units of work. Efficiency of a 'A'= 300b/15 = 20b units/day Efficiency of a 'B' = 300b/25 = 12b units/day Efficiency of a 'C' = (1/2) × 20b = 10b units/day Now, total task achieved = a × 300b units Work done by 2A, 3B and 4C working together in 30days = 30 × (2 × 20b + 3 × 12b + 4 × 10b) units = 30 × (40b + 36b + 40b) units = 3480b units ATQ, a × 300b = 3480b Or, a = 3480/300 = 11.6
What is the maximum duration allowed for coverage of post-harvest losses under the Pradhan Mantri Fasal Bima Yojana (PMFBY) for crops that need to be dr...
Which of the following is not a cause of seed deterioration?
The ICRAF headquarter is located at
Which one of the following is associated with rhizosphere?
Maximum CEC (cation exchange capacity) is of
Primary pollutants are pollutants that are emitted directly from a source, such as smokestacks of power plants and manufacturing facilities. What are se...
The economic thinker who extensively explained the causes and development of agricultural economics through models of population pressure and food suppl...
The factor which is NOT contributing to the change in the rural market are:
Which one the following crop is called biological plough of soil?
The purpose of glaciogenic seeding in cloud seeding is