Question
A does 55% of some work in 12 days. Later, with B’s
help, she completes the remaining work in 4 days. In how many days can Be B complete the entire work alone? type-sscSolution
Let total work = 120 units A does 45% of the work=120×45/100=36 Since A does 45% of the work (i.e. 36 units) in 12 days, A = 36/12 = 3 units per day Work left = 120 − 36 = 84 units Let B do x units of work per day. B and A finish the pending work in 4 days. ∴ 4(x + 3) = 84 ∴ 4x = 84 − 12 = 72 i.e. x = 18 units ∴ Time taken by B to complete the work = 120/18 = 6+2/3
days
Which organ of human body stores glucose in the form of glycogen?
Identify the Lacquers used for food cans.
Options:
1. Oleoresinous
2. Phenolic resins
3. Epoxy polyamide
4. Vinyl alkyd
secondary metabolite are produced during --------- of bacterial growth
Watery soft rot is mostly found in:
Steady state environment comprising of a special blend of Oxygen, Nitrogen and carbon dioxide monitored and maintained to extend the shelf life of cert...
Which of the following is a Class II product?
Butter or ghee is adulterated with the addition of……..
The percentage of acetic acid in commercially available vinegar is:
Who developed the process of canning?
Biological Oxygen Demand (BOD) is a measure of: