Question
The length, breadth and height of a room are 8m, 10m and
12m respectively. Find the cost of white washing the room at the rate of Rs 15 per m²?Solution
Area of walls = 2h (l + b) Length = 8m, breadth = 10m and height = 12m So, area of 4 walls = 2 × 12 (8 + 10) = 24 × 18 = 432 m² Area of ceiling = l × b = 8 × 10 = 80 m² So total area for white wash = 432 + 80 = 512 m² Rate per square meter = Rs 15 Then, Total cost = 512 × 15 = Rs. 7,680
A and B together can finish a work in 10 days. If A alone can finish it in 25 days, in how many days can B alone finish it?
A man, a woman and a boy can do a work in 4, 8, 16 days respectively. How many boys were required with 1 man and 1 woman to complete the same work in 1/...
A man is thrice as fast as a women and a woman is twice as fast as a boy. If all of them can do a work in 18 days. than a boy can do the work in?
x men can finish a work in y days. 0.9x women can finish 1/3rd of the same work in (y - 8) days. If 0.8x women can complete 1/3rd work in 36 days. Find ...
'Ramesh' can complete a work in 40 days. He started the work and left after 24 days from starting. The remaining work was done by 'Suresh' in 30 days. F...
A and B finish a job together in 36 days, while B and C together finish it in 48 days. The trio completes 75% of the job in 18 days. In how many days wi...
There is enough food in a camp to last for 50 days if each of the 40 soldiers present at the camp eat 2 times a day. After 20 days, 40 more soldiers jo...
- Suppose D, E and F can do a piece of work individually in 18, 27 and 36 days respectively. If they combine and work for 4 days, what percentage of work wou...
- A builder employed 12 workers to complete a job in 18 days. But after 8 days, 4 workers quit. How many more days will be required to complete the remaining...
Twenty laborers can complete a piece of work in 12 days. If 20 laborers started working and after 3 more days, additional laborers joined to complete th...