Question
βAβ and βBβ can do a piece of work in 30 days
and 40 days, respectively. They started working together but βAβ left after 9 days. Find the time taken by βBβ to complete the remaining work.Solution
Let total amount of work be 120 units (LCM of 30 and 40). Efficiency of βAβ = 120/30 = 4 units/day Efficiency of βBβ = 120/40 = 3 units/day Amount of work done by βAβ and βBβ together in 9 days = (4 + 3) Γ 9 = 63 units Time taken by B to complete remaining work = {(120 β 63)/3} = 19 days
Find the Square root of β14641
Calculate the lateral surface area of a right circular cone having a radius of 5 cm and a height of 12 cm.
What is the square root of 5476?
Find the Square root of β2116
Find the square root of 0.0324.
If the average of two numbers is 13 and the square root of their product is 12, then the difference between the numbers is:
Solve the following :-
Find the square of 572
Two times a number, added to the square of that number, gives 3. What could be the possible answer for this number?
What is the smallest natural number that should be added to 1030 so that the square root of the sum is a natural number?