Question
βAβ and βBβ can do a piece of work in 30 days
and 40 days, respectively. They started working together but βAβ left after 9 days. Find the time taken by βBβ to complete the remaining work.Solution
Let total amount of work be 120 units (LCM of 30 and 40). Efficiency of βAβ = 120/30 = 4 units/day Efficiency of βBβ = 120/40 = 3 units/day Amount of work done by βAβ and βBβ together in 9 days = (4 + 3) Γ 9 = 63 units Time taken by B to complete remaining work = {(120 β 63)/3} = 19 days
The least number which when divided by 5, 10, 12 and 15 leave zero remainder in each case and when divided by 18 leaves a remainder of 6 is:
- Calculate the number of factors of 480.
A number is three times another number and their HCF is 8. What is the sum of the squares of the numbers?
The sum of two numbers is 65 and their HCF is 13. Total number of such pairs of numbers is?Β Β Β
If two numbers are in the ratio 2:3, what is the ratio of their HCF to their LCM?
The least number which when divided by 8, 10, 12 and 15 leave zero remainder in each case and when divided by 16 leaves a remainder of 8 is:
The LCM of two numbers is 5 times of their HCF. The sum of LCM and HCF is 300. If one of the number is 250, then the other number is:
Three plots having an area of 210, 245 and 315 square meters respectively are to be sub-divided into equalised square flower beds. If the breadth of a b...
- The product of two numbers is 1344 and their L.C.M is 168. What is the H.C.F of the two numbers?