Let total amount of work be 120 units (LCM of 30 and 40). Efficiency of ‘A’ = 120/30 = 4 units/day Efficiency of ‘B’ = 120/40 = 3 units/day Amount of work done by ‘A’ and ‘B’ together in 9 days = (4 + 3) × 9 = 63 units Time taken by B to complete remaining work = {(120 – 63)/3} = 19 days
I: √(100 x4 + 125x4) + 7x + 41/2 = -4x
II: 3√(64y3) x 2y + 19y + 72 = -3y +...
Solve the quadratic equations and determine the relation between x and y:
Equation 1: 41x² - 191x + 150 = 0
Equation 2: 43y² - 191y +...
Equation 1: x² - 250x + 15625 = 0
Equation 2: y² - 240y + 14400 = 0
I. x2 – 19x + 88 = 0
II. (y + 4)2 = 121
Solve the quadratic equations and determine the relation between x and y:
Equation 1: 17x² - 94x + 120 = 0
Equation 2: 13y² - 45y + 13...
In each of these questions, two equations (I) and (II) are given.You have to solve both the equations and give answer Â
I. 7x² - 19x + 10 = 0...
I. 14p2 – 135p + 81 = 0
II. 7q2 – 65q + 18 = 0
I. 2 x ² + x  – 1 = 0                Â
II. 2 y ² - 3 y + 1 = 0
...I. 2x2 – 5x - 12 = 0
II. y2 – 11y + 30 = 0
I. 3p2Â - 11p + 10 = 0
II. 42q2Â + q -1 = 0