Question
The efficiency of A, B, C, D are in the ratio of 6 : 5 :
4 : 3. If A and C can do a work together in 6 days. Then How much days B and D will take to complete the same work?Solution
Efficiency of (A+C) = (6+4) = 10 Days taken by (A+C) together to complete the work = 6 days Efficiency of (B+D) = (5+3) = 8 So, B and D will take time = (Total days of (A+C)ΓTotal Efficiency of (A+C))/(Total Efficiency of (B+D)) = (6 Γ10)/8 = 60/8 = 7(1/2) days
The phenomenon of heterostyly, characterized by flowers having styles of different lengths, is typically observed in which fruit crop?
The decline of mango trees, commonly observed in orchards, is primarily spread through which pest?
Which technique is used in high-end floriculture to obtain virus-free planting material?
The transition from green to other colors in ripening fruit is mostly due to:
Which factor is known to trigger the most significant spike in a harvested crop's respiration?
Which of the following is most suitable root stock of mandarin?
Which tool is specifically designed for the gentle watering of seedlings?
What is the primary method for the commercial propagation of Pineapple?
Which factor contributes most significantly to "bent neck" disorder in cut roses during post-harvest storage?
Anthracnose in guava is caused by which pathogen?