Question
Solution
Time taken by A to complete 100% work = 4 Γ 5 = 20 days Time taken by B to complete 100% work = 10 Γ 3 = 30 days L.C.M of 20 and 30 = 60 = Total work Efficiency of A = 60/20 = 3 units/day Efficiency of B = 60/30 = 2 units/day Worked done by A and B together in 9 days = (3 + 2) Γ 9 β 45 units Remaining work = (60 β 45) units β 15 units C can complete the remaining work in 6 days Efficiency of C = 15/6 = 2.5 units/day Total efficiency of B and C = (2 + 2.5) units/day β 4.5 units/day Now, 75% of total work = 75% of 60 units β 45 units Required time = 45/4.5 days β 10 days β΄ B and C can complete 75% work in 10 days
Pea, gulmohur, bean, Cassia have ___ type of symmetry and hance they are ____ flowers.
Which major weed species is becoming increasingly resistant to Isoproturon in wheat fields of North India, posing a challenge for effective weed control?
Kisan call centre were launched in
How many kinds of genotypes are possible in Fβ, if four genes are segregating independently?Β
Under what agricultural circumstances are pest outbreaks most likely to be observed?
Lalit and Shweta are the varieties of:
Match the following:
Dropping of seeds in furrow lines in a continuous flow and covering them with soil is called as-
TZ test is done for ________ of seed.
Which is a common crop which is grown of natural autopolyploid?