Question
Solution
Time taken by A to complete 100% work = 4 × 5 = 20 days Time taken by B to complete 100% work = 10 × 3 = 30 days L.C.M of 20 and 30 = 60 = Total work Efficiency of A = 60/20 = 3 units/day Efficiency of B = 60/30 = 2 units/day Worked done by A and B together in 9 days = (3 + 2) × 9 ⇒ 45 units Remaining work = (60 – 45) units ⇒ 15 units C can complete the remaining work in 6 days Efficiency of C = 15/6 = 2.5 units/day Total efficiency of B and C = (2 + 2.5) units/day ⇒ 4.5 units/day Now, 75% of total work = 75% of 60 units ⇒ 45 units Required time = 45/4.5 days ⇒ 10 days ∴ B and C can complete 75% work in 10 days
Which of the following crop has the longest crop-weed completion critical period?
RRB came into the existence in the year _______.
The nitrifying bacteria areÂ
Harvest Index (HI) is the ratio of:
Super rice is developed by
Tomato originated in:
______ is known as Father of Natural farming.
The types of animal tissues include ...................?
The grafting technique called ‘stone grafting’ is primarily used in which fruit crop?
When the leaflets are joined together at a common point at the petiole, the type of leaf is