A job is done by 15 men in 30 days and 30 women in 20
days. How many days will it take for 8 men and 12 women to finish the work?Solution
15 men × 30 days = 450 Women’s 1-day work = 450/(30× 20) = ¾ work (8 Men + 12 Women)’s 1-day work = 8 +12 × ¾ = 17 Days taken by 8 M and 12 women to finish the work = 450/17 days Alternate Method: 15 Men can do this job in 30 days and 30 women can do this job in 20 days It means 45 men or 60 woemn can do this job in = 10 days So 8 Men and 12 women can do this job in = 10/{8/45 + 12/60} = 10/ {8/45+ 1/5} = 10 /{17/45} = 450 /17
A concave lens has a focal length 15 cm. If the object is placed at 30 cm from the lens, what is the image distance?
Consider the following statements:
1. A flute of smaller length produces waves of lower
2. Sound travels in rocks in the form of longitudi...
The Atom Bomb dropped in Nagasaki is an uncontrolled nuclear fission made up of:
Quantum Theory was discovered by?
Which of the following instruments is correctly matched with its function?
I) Voltmeter - Measures potential differenceÂ
II) Ammeter - Me...
How is the slope of the production possibility curve (PPC) described?
A ship will submerge when it displaces water equal to its
Which of the following physical quantities is scalar quantity ?  Â
Which material has the lowest refractive index?
Which of the following represents Pressure?