Start learning 50% faster. Sign in now
One day work of 14 Indians and 8 Chinese = 1/8 One day work of 14 Japnese and 6 Chinese = 1/14 Therefore, one day’s work of 14 Indian, 14 Chinese and 14 Japanese = 1/8 + 1/14 = (7 + 4)/56 = 11/56 Therefore, one day’s work of 1 Indian, 1 Chinese and 1 Japanese = 11/56 × 1/14 = 11/784 Therefore, number of days required by 1 Indian, 1 Chinese and 1 Japanese = 784/11 = 71*3/11 days
If a metal can be drawn into wires relatively easily it is called:
What is the atomic mass of carbon?
Sour Taste of Coca-Cola is due to the presence of which of the following acid?
What is the industrial name of Epsum?
Speed of light will be maximum in which of the following mediums?
What happens to the gravitational force between two objects if the distance between them is doubled ?
A liquid initially contracts when cooled down to 4°C but on further cooling down to 0°C, it expands. The liquid is
When a forward bias is applied to a p-n junction, it
A magnetic force does no work on a moving charged particle because:
What is the pH level of pure water?