Question
C is 50% more efficient than D. Together, they can
finish a task in 12 days. How many days will D alone take to complete the task?Solution
Let D’s efficiency be x. Then, C’s efficiency is 1.5x. Together, their combined efficiency is x + 1.5x = 2.5x. Now, total work = 2.5x × 12 = 30x. D’s time to complete the work alone = total work ÷ D's efficiency = 30x ÷ x = 30 days. Final Answer: (b) 30 days
If the volume of a cube is 64cm³, then the diagonal of cube is
Find the area of triangle having sides 28 m, 45 m, and 53 m.
Find the difference between angle and its complement if the angle is two-seventh of its complement.
AC and CE are the medians of triangle ABD and ACD respectively. If area of triangle ACE is 15 cm 2 , then find the area of triangle ABD.
In an orchard, the ratio of the number of mango and lichi trees is 4:7, respectively. Also, there are few apple trees in the orchard which is 50% more t...
Let two chords AB and AC of the larger circle touch the smaller circle having same centre at X and Y. Then XY = ?
Find the area of triangle having sides in the ratio 3:5:7 & the perimeter of the triangle is 60 cm
ABC is a triangle. AB = 5 cm, AC = √41 cm and BC = 8 cm. AD is perpendicular to BC. What is the area (in cm2) of triangle ABD?
The area of an equilateral triangle is 36√3 sq m. Its perimeter is
The lengths of three medians in a triangles are 9 cm, 12 cm, 15 cm. What is the area of that traingle (in cm 2 )?