Question
A can complete a piece of work in 10 days. B is 25% more
efficient than A. How many days will B alone take to complete the same work?Solution
Let A's efficiency is 4a. So, B's efficiency = 4a + 4a x 25%=5a Now, total work = 4a x 10=40a So, B will take to complete the task = 40a/5a = 8 days B alone will take 8 days to complete the same work.
Aluminium Phosphide is used to control stored grain pest _____
‘Centering’. The first cut on a young tea plant is at which of the following:Â
Water is drawn upwards from the water table in a continuous network of pores. This upward movement of water occurs only in saturated soils is called
What is the major limitation of privatized extension services?
The land-related reform enacted to protect tenants from eviction and secure their right to cultivate the land is known as:
Triazines and triazinones inhibit ______
The critical limit for NO3-N (mg/litre) in drinking water (as per WHO standard is:
Khaira disease of rice can be controlled by spraying of ____________ .
Bengal famine in 1943 was caused due to which disease?
The scientific name of the Italian honey bee is