Start learning 50% faster. Sign in now
Let the efficiency of Manoj be M and that of Santosh be S. Total work to be done (according to Manoj) = 15 × M × 8 Total work to be done (according to Santosh) = 10 × S × 9 Work done by both are the same, => 15 × M × 8 = 10 × S × 9 => M/S = 3/4 Let the efficiency of Manoj and Santosh be 3 and 4 respectively. Working together, total efficiency = 3 + 4 = 7 Let them finish the work by D days. Total work to be done = 15 × M × 8 = 15 × 3 × 8 => 7 × D × 6 = 15 × 3 × 8 Time taken = 360/42 = 8 (4/7) days
What is a fertiliser that supplies two or more than two primary nutrients called?
What would happen to the weight of a body in a lift moving upward with uniform speed?
Which of the following gas usually causes explosions in coal-mines?
What is the pH level of pure water?
What is the chemical formula for water?
NaOH + HC1 -> NaCl + H₂ O in the given chemical reaction
In a reverse-biased p-n junction diode, which of the following occurs as reverse voltage increases?
Which of these is not a function of the liver?
Which of the following is Vitamin-E?
The moment of inertia of a hollow sphere of mass M and radius R about its diameter