Start learning 50% faster. Sign in now
Get Started with ixamBee
Start learning 50% faster. Sign in nowVolume of tank = 3 × 122 × 14 = 6048 m3 Required time taken = 6048/94.5 = 64 minutes
If ‘PLATINUM’ is coded as ‘98’ and ‘ WHETHER’ is coded as ‘80’, then what is the code for ‘ NUISANCE’ ?
...In a certain code language, ‘TOLERANCE’ is written as ‘VQNGTCPEG’. What will be the code for ‘CAPTURING’ in the same code language?
...Which of the following code is incorrectly matched?
What will be the code for ‘record assembly allegedly suffers’?
What may be the possible code for the word‘Manufacturing’?
What is the code for ‘Live’ in the given code language?
Select the option that is related to third number cluster in the same way second number cluster is related to first number cluster.
12 : 9 :: 13 : ?
If 'share sky day' is coded as 'tm, ps, jl' then what may be the code for 'human current captures' in the given code language?
What is the code of ‘costs’?
What is the position of Y with respect to X?