Question
The daily wages of A and B respectively are Rs.3.50 and
2.50. When A finishes a certain work, he gets a total wage of Rs. 63. When B does the same work, he gets a total wage Rs.75. If both of them do it together what is the cost of the work?Solution
daily wage of A = Rs 3.50 total wage earned by A = Rs 63 total wage earned by B = Rs 75 no of days B worked = (total wage earned / daily wage) = 75/2.50 = 30 days no of days taken to complete the work when A and B do together = (xy / x+y) { when A takes x days and b takes y days} = (18×30) / (18+30) = 90/8 days Total amount paid to A and B per day = 3.50 + 2.50 = Rs 6 Total amount to be paid =90/8 × 6 = 135/2 = Rs 67.50
Mean deviation is least when calculated about:
the process of trashing is done In which of the of the following crops?
On the basis of climatic condition, Walnut is an example of which type of fruit crop?
Relatively more drought tolerant crop is
Azolla is used as biofertilizer in
Lichens, the pioneer organisms that initiate ecological succession are actually a symbiotic association of
Durum/ Macroni wheat (Triticum durum) is:
Among the following, where is the International Potato Center is located ?
The term Retting is associated with which crop?
Mostly plants absorb micronutrients in