Question
‘A’ and ‘B’ can do a piece of work in 18 days
and 25 days, respectively. They started working together but ‘A’ left after 9 days. Find the time taken by ‘B’ to complete the remaining work.Solution
Let total amount of work be 450 units (LCM of 18 and 25). Efficiency of ‘A’ = 450/18 = 25 units/day Efficiency of ‘B’ = 450/25 = 18 units/day Amount of work done by ‘A’ and ‘B’ together in 9 days = (25 + 18) × 9 = 387 units Time taken by B to complete remaining work = {(450 – 387)/18} = 3.5 days
Trichogramma chilonis can be used to control the:
____ month is observed as Rashtriya Poshan Maah every year in India.
Who is considered the Father of Plant Tissue Culture?
C/ N ratio of paddy straw, in general, is:
Which one of the following is “Macaroni Wheat”?
Minimum fertilizer for a positive crop response
Which of the following types of insecticides are not used against food grain pests in storage?
Food products which provides health benefits beyond the nutrient contribution when they are eaten on regular basis in adequate amount is called.
Apple is temperate fruit crop. Best time for the propagation in apple is:
“Bastard saffron” is term used for: