Question
Out of the 500 GW renewables target, 280 GW is set for
solar power it has been set to be completed by the year?Solution
 India wants to increase its solar capacity to 280 GW by 2030-31 from about 39 GW at present.
In the following letter set, the second letter set is related to the first letter set in a certain way, find the letter set from the options which is r...
986 : 53 : : 725 : ?
Select the option that is related to the third number in the same way as the second number is related to first number and the sixth number is related to...
Select the option that is related to third word in the same way as the second word is related to first word.
SETS : WAXO :: PORT : ?
Select the combination of the letters that when placed sequentially in the blanks of the given letter series will complete the series.
_ f _ g _ ...
If ASH = 1198 and ASHES = 1198519, then SQUASH =
Select the option that is related to the third word in the same way as the second word is related to the first word.
 Chichen Itza : Mexico :: ...
âInsectâ is related to âLarvaâ in the same way as âPigâ is related to ____.
Toyotaâ is related to âJapanâ in the same way âSamsungâ is related to â___â.
Select the option that is related to third letter cluster in the same way as second letter cluster is related to first letter cluster.
DEL: IJQ :: OIL: ?