Question
In a Public-Private Partnership (PPP), what is the
purpose of Viability Gap Funding (VGF)?Solution
Viability Gap Funding (VGF) is designed to support PPP projects that are economically justified but lack financial viability. It provides a capital subsidy to make such projects attractive to private sector participants.
How many seconds will a train 66 m in length, travelling at the rate of 40 km an hour, take to pass another train 82 m long, proceeding in the same dire...
- A 220 metres long train, travelling at 60 km/h crosses a platform in 30 seconds. What is the length of the platform?
A goods train leaves a station at a certain time and at a fixed speed. After 9 hours, an express train leaves the same station and moves in the same dir...
A train running at a speed of 90 km/h crosses a bridge in 45 seconds. If the length of the train is x meters, and length of the bridge is (6x+75) meters...
A train crosses a 500-metre-long platform in 30 seconds, and the same train crosses a tunnel 20% longer than the platform in 42 seconds. Find the speed ...
Train βAβ running with a speed of 72 km/h crosses a pole in 8.5 seconds. If the time taken by train βAβ to cross train βBβ running with a sp...
A high-speed Bullettrain takes 20 seconds to cross a platform. The length of the Bullettrain is 40% less than the length of the platform. If the Bullett...
Two trains βAβ and βBβ started from station βPβ and βQβ towards station βQβ and βPβ respectively at the same time. When they met...
Two trains 200 metres and 100 metres in length are running towards each other on parallel tracks, one at the rate 50 km/hr and another at 40 km/hr. In h...
Train βLβ is travelling with a speed of 90 km/hr and crosses a vertical pole in 4 seconds. Train βKβ is 60 metres longer than βLβ and trave...