Question
Poor construction practices, inadequate
maintenance, uncontrolled livestock access and cropping too close can all lead toSolution
Bank erosion is the progressive undercutting, scouring and slumping of the drainage channels.
A train with 12 compartments of equal length takes 30 seconds to cross a pole and 40 seconds to cross a 240-metre-long platform. If 6 compartments of th...
Two trains of same length are running in parallel tracks in the same direction with speed 50 km/hr and 110 km/hr respectively. The latter completely cro...
A train travelling with a speed of 72 km/h can cross a pole in 8 seconds. Find the time taken by the train to cross a 200 metres long platform if the sp...
A train travelling at the speed of 72 km/hr crosses another train, having 20 meters less length and travelling in opposite direction at the speed of 54 ...
Two trains, A and B, cross each other in 15 seconds and 35 seconds respectively, when running in opposite and the same direction respectively. If the sp...
A train can cross a pole in 10 seconds while it can cross a 360 metres long platform in 30 seconds. Find the time (in hours) taken by the train to cover...
A train passes a stationary pole in 18 seconds and passes a bridge of length 540 metres in 45 seconds. What is the speed of the train in km/h?
Length of a train, whose speed is 45 km/h, is 225 metres. Find the time taken (in seconds) by train to cross a bridge of length 375 metres.
A train takes 25 seconds to cross a platform and 5 seconds to cross a pole. If the length of the train is 60 metres less than the length of the platform...
Train A running at speed of 126 km/hr crosses a platform having twice the length of train in 15 sec. Train B whose length is 400m crosses same platform ...