Question
Which of the following statements is/are
true? Study the following information carefully to answer the given questions: There are ten persons i.e A, B, C, D, E, F, G, H, I and J, who lives in a building having five floors such that ground floor is numbered as 1 and above it is 2 and so on up to top floor numbered as 5. Each of the floor consist of 2 flats as flat-A, flat-B. Flat-A of floor-2 is immediately above flat-A of floor-1 and immediately below flat-A of floor-3 and in the same way flat-B of floor-2 is immediately above flat-B of floor-1 and immediately below flat-B of floor-3 and so on. Flat-B is in east of flat-A. Note: If A lives above (or below) B, then there are living in same flat unless stated otherwise. G lives to the East of the one who lives immediately above of A. I and F don’t live in same floor. A lives in an odd numbered floor. D lives west of J, who lives second to above the flat of B. C lives two flats below of H who lives on Floor-4 and in flat-A. I lives north-west of E.Solution
G lives to the East of the one who lives immediately above of A. A lives in an odd numbered floor. As per these lines two Cases will Arrive: C lives two flats below of H who lives on Floor-4 and in flat-A.
D lives west of J, who lives second to above the flat of B Note: Here we get one more sub case from case-1
I lives north-west of E Note: Case-2 rejected since I lives north-west of E is not possible.
I and F don’t live in same floor. Note: Case-2 rejected since I and F don’t live in same floor is not possible. The final table arrangement is:
A2 type ‘P’ pipes can fill a tank in 450 hours, while B2 type ‘Q’ pipes can fill the same tank in 6...
- Karan can do 60% of a job in 36 days while Meena does 20% in 18 days. Karan works for 20 days and stops. Calculate how many days Meena will take to complet...
A man’s average income for the first 3 months is 12% of his total income. For the next 6 months the average monthly income was Rs. 25,400. His total i...
A man, a woman and a boy can do a work in 3, 2, 6 days respectively. How many children were required with 1 man and 1 woman to complete the same work in...
Tanu can complete a task in 'A' days on her own, while together with Manu, they can complete the same task in (A - 6) days. Manu, working alone, can fin...
With P starting the work, working on alternate days, P and Q can finish a work in 17 days. If Q works on the first day and Q and P work alternately, the...
A boy(labour) was appointed by a manager on the term that he would be paid Rs 55 for each day of his work but would be fined at the rate of Rs 5 per day...
2 men and 3 boys can do a piece of work in 405 days while 3 men and 2 boys can do the same work in 324 days. In how many days can 5 men and 5 boys do th...
K and L can complete a work in 16 days. If K alone can complete it in 48 days, how long will L take to complete the work alone?
A’ and ‘B’ together can complete a work in 20 days while ‘A’ takes 25 days to complete the same work alone. If ‘C’ is 60% more efficient t...