Question
Which of the following floor and lift does ASHISH use?
Study the following information carefully and answer the below questions There are four floors in an apartment with two lifts Viz., Lift-1, and Lift-2. Lift-1 is to the west of Lift-2. Eight persons-AMAN, ANKIT, ARUN, ARJUN, ARYAN, ASHOK, ASHISH, and ASHWANI are using these two lifts to reach certain floors of the apartment but not necessarily in the same order. The lowermost floor is numbered as 1 and the floor above is numbered as 2 and so on, No two persons use the same lift on the same floor. Only one floor is between AMAN and ASHISH, both are using the same lift. Neither ANKIT nor ARJUN using the lift on the same floor of ARUN. ARJUN is getting into the lift immediately above ASHWANI’s lift. Both ARUN and ARYAN are using the same lift, ARYAN gets in above ARUN. Either ARJUN or ASHWANI is getting into the lift on the same floor of AMAN. ASHOK does not get into the lift on an odd numbered floor. AMAN is getting into the lift on an even numbered floor but not an even numbered lift.Solution
AMAN is getting into the lift on an even numbered floor but not an even numbered lift. Only one floor between AMAN and ASHISH, both are using the same lift. From the above condition, there are two possibilities .
ARJUN is getting into the lift immediately above ASHWANI’s lift. Either ARJUN or ASHWANI is getting into the lift on the same floor of AMAN. From the above condition, there are three possibilities.
ASHOK does not get into the lift on an odd numbered floor. Both ARUN and ARYAN are using the same lift, ARYAN gets in above ARUN.
Neither ANKIT nor ARJUN using the lift on same floor of ARUN From the above condition, Case1 and case2a were dropped. 
15 men can do a piece of work in 10 days working 12 hours a day. How many men can do double the work in 25 days working 8 hours a day?
A alone can do a piece of work in 10 days and B alone in 15 days. In how many days will they finish the work together?
A does 1/2 work and B does 3/4 work in the same time. Difference between number of days taken by A and B to work alone to complete the work individually...
Ajay and Bheem collectively earned Rs.9,000 for completing a task, with Bheem's share being Rs.3,000. If Bheem can complete the work on his own in 48 da...
A, B and C alone can complete a work in 30, 60 and 45 days respectively. All of them started working together but after 3 days from start A left the job...
Mohan, Sohan, and Rohan alone can finish a piece of work in 50, 100, and 150 days respectively. They start the work together, but Mohan leaves after 8 d...
12 children and 18 men complete an artwork in 9 days. Each child takes twice as long as a man to finish the artwork. How many days will it take for 18 m...
A group of 24 men is capable of finishing a task in 15 days. Initially, 12 men begin the job and work on it for 12 days. After this period, an additiona...
Billy, Tony and Mike were three workers, employed by a Contractor. They completed the whole work in 20 days. Initially all of them worked together, but ...
Pawan can finish a task in 28 days, while Bhavna requires 7 more days than Pawan to complete the same task. They both started wor...