Question
Two Bikes start from the opposite places of a highway
250km apart. First Bike A runs for 45km and takes a right turn and then runs 25km. It then turns left and then runs for another 35 km and then takes a left turn and stopped after reaching the highway. In the mean time, due to minor clutch down the other bike B could run only 55 km along the highway and stopped after that. What would be the distance between two bikes at the point where both have stopped?Solution
Required distance = 250 – (45 + 35 + 55) = 250 – 135 = 115 km.
βAβ can complete a work in 15 days and is 50% more efficient than βBβ. βAβ and βBβ start working together and βAβ leaves after 8 day...
Ravi and Sita together can complete a piece of work in 150 days and 3 minutes, while Sita and Ramesh together can complete the same work in 90 days and ...
Working together, A and B can do a certain work in 45 days. They work together for 10 days. They complete the remaining work in 28 days with the assista...
P and Q can do a piece of work in 20 days and 12 respectively, P started the work alone and then after 4 days Q joined him till the completion of the wo...
Arjun is 50% less efficient than the combined efficiency of Bheem and Cherry. If Bheem can complete a task in 12 days and Cherry in 20 days, determine t...
- βPβ takes 25 days to complete a piece of work. βQβ is 25% more efficient than βPβ. Find the time taken by them to complete 90% of the work toge...
A is five times as efficient as B and can finish a piece of work in 24 days less than B. B can finish this work in how many days?
The efficiency of X is 50% of the efficiency of Y. If Y can type 180 pages in 45 days, then find the number of days taken by X alone to type 360 pages.
If 14 men working 14 hours a day can make 14 quilts in 14 days, then in how many days 28 men working 28 hours per day will make 28 quilts?
A and B together can complete a piece of work in 36 days while A and C together can complete the same work in 39 days. If A, B, and C together can compl...