Question
What was the day of the week on ‘2nd March
2018’?Solution
Date: 2nd March 2018
Steps to find the day of the week:
Total = (18 + 4 + 4 + 2) = 28
And 28 ÷ 7, we get 0 as remainder.
Note:
Year < 2000 – leave the remainder as it is
Year > 2000 – subtract 1 from the remainder.
0 is the code for Saturday and one day behind Saturday is Friday.
Seed cotton means
Which part of sugarcane is preferred for sowing?
ICAR- Central Institute of Cotton Research is located at ___
Seed rate in true potato seed (TPS) of potato is
Seeds are formed but the embryos develop without fertilization in
Which implement is used to break hard pan in soil
What is the minimum genetic purity required for certified hybrid cotton seeds?
National seed act was passed in
Minimum isolation distance for the production of foundation seed of rice is
Seeds which cannot be successfully stored for long periods are known as