Question
Select the option in which the numbers does not share
the same relationship in set as that shared by the numbers in the given set. (Note: Operations should be performed on the whole numbers, without breaking down the numbers into its constituent digits. E.g., Operation on 13 such as adding/subtracting/ Multiplying etc. to 13 can be performed. Breaking down 13 into 1 and 3 and then performing mathematical operations on 1 and 3 is not allowed) (25, 35, 120)Solution
The logic is: Third number = (First number + Second number) x 2 In (25, 35, 120), Third number = (25 + 35) x 2 = 60 x 2 = 120. A) (15 + 25) x 2 = 40 x 2 = 80, matches. B) (12 + 18) x 2 = 30 x 2 = 60, matches. C) (20 + 30) x 2 = 50 x 2 = 100, matches. D) (22 + 33) x 2 = 55 x 2 = 110 which is not equal to 90.
P walks around a circular field at the rate of one round per hour while Q runs around it the rate of five rounds per hour. They start at same point at 8...
In a 300-metre race, βAβ beats βBβ by 20 seconds or 60 metres. Find the time taken by βBβ to finish the race.
- A train departs station 'Z' at 5:15 AM traveling at 90 km/h. Another faster train leaves the same station at 7:00 AM traveling at 120 km/h. At what time wi...
John cycles at 10 km/h to reach his destination at 2 PM. If he travels at 15 km/h, he will reach at 12 noon itself. At what speed should he travel to re...
A train 250 meters long crosses a platform in 20 seconds at a speed of 72 km/hr. How much time will it take to cross another train 300 meters long, runn...
A person covers one-fourth of a trip at a speed of 10 km/hr and takes βxβ hours for that. If he had completed the whole journey at a speed of 20 km/...
Buses A and B are moving around a circular ground of radius 350 m. If the speeds of the buses A and B are 15 m/sec and 20 m/sec respectively, then what ...
- A ball is dropped from a height of 120 metres. After each bounce, it rises to one-fourth of the height from which it fell. What is the total distance the b...
A, B, and C are working together on a project. A can complete the project alone in 15 days, B in 20 days, and C in 30 days. On the first day, A, B, and ...
If a bus travel 15 km in 10 minute then how much time take if speed is decrease by 15 km/h?