Question
In the following question, four number pairs are given.
In each pair the number on left side of (-) is related to the number on the right side of (-) with some Logic/Rule/Relation. Three pairs are similar on basis of same Logic/Rule/Relation. Select the odd one out from the given alternatives. (NOTE: Operations should be performed on the whole numbers, without breaking down the numbers into its constituent digits. E.g., 13 - Operations on 13 such as adding/ subtracting/ multiplying etc. to 13 can be performed. Breaking down 13 into 1 and 3 and then performing mathematical operations on 1 and 3 is not allowed)Solution
The logic followed here is: 2nd number = 11 X 1st number.
25 β 275 = 11 X 25 = 275.
21 β 231 = 11 X 21 = 231.
37 β 407 = 11 X 37 = 407.
44 β 484 = 11 X 44 = 484.
A certain number of men, represented as 'm', can finish a task in 40 days. However, if there were 15 additional men, the same task would be completed in...
Priya, Riya, and Supriya can complete a piece of work individually in (20/3) days, 20 days, and 25 days, respectively. If they work together, how many d...
A and B together can complete a piece of work in 36 days while A and C together can complete the same work in 39 days. If A, B, and C together can compl...
Nikhil and Rohit together can complete a job in 105 days 8 minutes, while Rohit and Suresh together can finish the same job in 70 days 5 minutes. If Sur...
- Karan can do 60% of a job in 36 days while Meena does 20% in 18 days. Karan works for 20 days and stops. Calculate how many days Meena will take to complet...
A is twice as efficient as B and can finish a piece of work in 22 days less than B. B can finish this work in how many days?
P can do a piece of work in 10 days, Q can complete double the work in 30 days and R can do the work in 20 days. If all of them together earn Rs. 3900, ...
βAβ and βBβ can complete a certain work in 10 days and 15 days, respectively. They started working together and worked till completion of the wo...
A can complete a work in 20 days. B takes 10 days less than A to complete the same work. In how many days can both of them together complete 90% of the ...
- Pooja used to solve 36 problems in 72 minutes. After her efficiency decreased by 33.33%, how long will she now take to solve the same number of problems?