Question
A can complete 5/6 of a work in 15 days and B can
complete 2/3 of work in 8 days. In how many days both A and B together can complete the work?Solution
A completes 5/6 units in 15 days A completes 1 unit in 15 x (6/5) = 18 days B completes 2/3 unit of work in 8 days B completes 1 unit of work in 8 x 3/2 = 12 days LCM of 12 and 18 = 36 units A's efficiency = 3 units/day and B's efficiency = 2 units/day A and B will complete the whole work in (total work)/efficiency of (A + B) = 36/(3 + 2) = 7(1/5) days
Consider two concentric circles having radii 17 cm and 15 cm. What is the length (in cm) of the chord, of the bigger circle, which is a tangent to the s...
If O is the orthocentre of ΔABC , if ∠ BOC = 105 0 then what is the measure of ∠ BAC?
In the given figure CD is parallel to AB then ∠y is?

If O is circumcentre of acute angled triangle ABC, if ∠ OBC = 150 then ∠BAC = ?
- Length of a chord in a circle of radius 'r' cm, is 40 cm and distance between chord and centre of the circle is 21 cm. Find the value of (2r + 1).
The sides of a triangle are 10 cm, 17 cm, and 21 cm. Find the area of the triangle using Heronโs formula.
The radius of the incircle of a triangle is 8 cm. if the area of the triangle is 56 cm 2 , then its perimeter is?
The internal bisector of โABC at โ A cuts BC on D and cuts the circumcircle at E. If DE = 6cm, AC = 8cm and AD = 10 cm, then find the length of AB?
Find the area of triangle having sides 5 m, 6 m, and 9 m.