Question
X and Y can complete a piece of work in 20 days. They
worked for 10 days and left. Z completed the rest of the work in 10 days. Find how long Z would take to finish 60% of the same work alone.Solution
ATQ,
Fraction of Work done by X and Y = (10/20) = (1/2)
Fraction of work done by Z = 1 - (1/2) = (1/2)
So, number of days taken by Z alone to complete the entire work = 10 ÷ (1/2) = 20 days
So, time taken by Z to complete 60% of the work = 20 × 0.60 = 12 days
12.5% of 96 =?
If the numerator of a fraction is increased by 25% and the denominator is decreased by 10%, the value of the new fraction 25/24, Find the original faction.
- The product of two decimals is 0.675. If one of the decimals is 2.5, then find the other decimal.
Alex has read 5/6 of a book, while Tina has read only 3/5 of the book she is reading. Both have another 150 pages of their respective books remaining to...
Which fraction bears the same ratio to 1/27 as 3/11 does to 4/9?
The difference between the smallest and the largest fraction among 3/2, 1/5, 4/3, 5/4 is
A man distributed some candies to his three sons A, B and C. A, being the eldest got two times the number of candies that C got while A and B together h...
If the sum of 60% of a fractional number and the number's square root is 5 greater than one fifth of the number, then the number is
Which of the following fractions is a terminating decimal?