ATQ,
Pawan’ alone can do the complete work in (6/0.4) = 15 days
Efficiency of ‘Pawan’ = 2 × efficiency of ‘Qureshi’
As, we know efficiency is inversely proportional to time taken when work done is constant.
So, ‘Qureshi’ alone can complete the work = (15 × 2) = 30 days
Let the total work be 30 units {LCM of 15 and 30}
Efficiency of ‘Pawan’ = (30/15) = 2 units/day
Efficiency of ‘Qureshi’ = (30/30) = 1 unit/day
So, time taken by ‘Pawan’ and ‘Qureshi’ to complete the work together = (30/3) = 10 days
The innermost layer of the human gut wall is:
Which among the following is a technique of idea generation:
Which scientist isolated the bacteria ,Bacillus radicola?
What is the main advantage of using expert systems in extension education?
A 9-row seed cum fertilizer drill operated at forward speed of 5 km/hr with field efficiency of 80% having row spacing of 200 mm will have effective fil...
Which type of meristem is responsible for the increase in girth or thickness of plants?
The isolation distance for the production of foundation seed in bajra is:
Most of apple varieties have the chilling requirement of
In guava, lemon jackfruit which type of cutting is used for propagation ?
‘Centering’. The first cut on a young tea plant is at which of the following: