Question
A and B can complete a task together in 18 days, while B
alone takes 36 days to finish it. A began working alone and left after ‘x’ days, after which B completed the remaining work in 27 days. Determine the percentage of the total work completed by A.Solution
Let total amount of work be 36 units
Efficiency of (A + B) = 36/18 = 2 units/day
Efficiency of ‘B’ = 18/18 = 1 unit/day
Amount of work done by ‘B’ = 27 × 1 = 27 units
Percentage of work done by ‘A’ = {(36 – 27)/36} × 100 = 25%
I am not conversant ________ local languages.
The study of pronunciation of words is called
Select the option that expresses the given sentence in passive voice.
The chef prepared a gourmet meal for the guests, impressing everyone wit...
The ministry has directed all engineering colleges in India, (A)/ the ones that figures in the National Institutional Ranking Framework rating, (B)/ to ...
S1: In neighbouring Tamil Nadu, Kodaikanal has fallen on bad times.
S6: It is still a source water-albeit unpotable for the thirsty Kodai.
"Rama comes to college regularly". It is
The intricate artwork broke all records at the auction house.
Mary said, “I have to be there by 10 am tomorrow.”
Select the most appropriate Antonym of the emboldened word.
The blood DCs are typically identified and enumerated in flow...
I am posted upto date _______ your case.