Start learning 50% faster. Sign in now
Let total amount of work be 36 units
Efficiency of (A + B) = 36/18 = 2 units/day
Efficiency of ‘B’ = 18/18 = 1 unit/day
Amount of work done by ‘B’ = 27 × 1 = 27 units
Percentage of work done by ‘A’ = {(36 – 27)/36} × 100 = 25%
The term “Arrowing” is associated with
The collection of experimental methods of growing large number of isolated cells under sterile condition?
Tristeza is the viral disease of citrus which is particularly transmitted by which of the following:
Urea contains nitrogen in
The crop growing season in dry land farming ranges from ____to___
“Golden treasure” of Assam is known to which silk
One of the most important oilseed crop Arachus hypogea contains ___% oil.
Unit less measure of dispersion is
ICAR- Indian Institute of Rice Research is situated at
The bright yellow colour of the labels the insecticide container indicates that product is: