Question
A and B can complete a task together in 30 days, while B
alone takes 60 days to finish it. A began working alone and left after ‘x’ days, after which B completed the remaining work in 45 days. Determine the percentage of the total work completed by A.Solution
Let total amount of work be 60 unitsEfficiency of (A + B) = 60/30 = 2 units/dayEfficiency of ‘B’ = 60/60 = 1 unit/dayAmount of work done by ‘B’ = 45 × 1 = 45 unitsPercentage of work done by ‘A’ = {(60 – 45)/60} × 100 = 25%
If in a ΔABC, AD is internal angle bisector & D is a point on BC, AB = 6cm, BC = 9cm then what is BD:CD?
A right triangular pyramid XYZB is cut from cube as shown in figure. The side of cube is 16 cm. X. Y and Z are mid points of the edges of the cube. What...
If in a ΔABC, AD is internal angle bisector & D is a point on BC, AB = 3cm, BC = 5cm then what is BD:CD?
In the given Figure, Find  angle BCD. If AB is a diameter & AB is parallel to CD.
If I is the incentre of ΔABC , if ∠BAC = 750 , then what is the measure of ∠BIC?
Find the area of triangle having sides in the ratio 2:4:5 & the perimeter of the triangle is 22 cm
In ABC,D is a point on side AB such that BD = 2 cm and DA = 3 cm. (E is a point on BC such that DE) AC, and AC = 4 cm. Then (Area of A BDE) : (Area of ...
The radius of a circle is 25 cm, and the length of the chord is 14 cm. Find the distance between the chord and the centre of the circle. Â
The area of an equilateral triangle is 36√3 sq m. Its perimeter isÂ