Question
Time taken by A and B together to complete a work is 1
day less than the time taken by B alone to complete the same work. With his half efficiency B can complete the work in 10 days. find the efficiency ratio of A to B.Solution
ATQ,
B's full efficiency: B completes the work in 5days (since with half efficiency, B takes 10days). A and B together: Time taken = 5−1 =4 days. Combined efficiency of A and B = 1/4 work units/day. B's efficiency = 1/5 work units/day. A's efficiency: Efficiency ratio (A:B):
The efficiency ratio of A to B is 1:4 .
What is the primary purpose of virtual memory in a computer system?
Which of the following characteristics describes an ideal operational amplifier (op-amp)?
Which of the following is an example of a message-passing IPC mechanism?
Which famous algorithm follows a greedy approach for solving the minimum spanning tree problem in a graph?
What is the decimal value of the floating-point number C1D00000 (hexadecimal notation)? (Assume 32-bit, single precision floating point IEEE representat...
What is the definition of an NP-hard problem?
Which device operates at physical layer
What does PHP stand for?
A problem is NP-complete if:
In a typical Ethernet LAN, what type of cable is commonly used for wired connections?