Question
Ajay and Bijay can individually
complete a task in 18 days and 24 days, respectively. If they work together to finish the task and earn a total wage of Rs. 2,240 for completing the entire work, what is the total amount of wage received by Ajay?Solution
ATQ, Let total task = 72 units {LCM of 18 and 24} Efficiency of 'Ajay' = 4 units per day Efficiency of 'Bijay' = 3 units per day. ATQ; Total wage received by 'Ajay' = 4/7 × 2240 = 4 × 320 = Rs. 1,280
Find the radius of the sphere whose volume is 562.5π cm3
What will be inradius of a right angle triangle whose base is 11 cm & height is 60 cm ?

The lengths of three medians in a triangles are 15 cm, 20 cm, 25 cm. What is the area of that traingle (in cm 2 )?
If the volume of a cube is 64cm³, then the diagonal of cube is
In a triangle ABC, AB = 13 cm, BC = 14 cm, and AC = 15 cm. Find the area of the triangle and the length of the altitude from vertex A to side BC.
If I is the incentre of ΔABC , if ∠ BAC = 450 , then what is the measure of ∠ BIC?
In the figure given below, AC = 16 cm and BF = 5 cm. If AE:CE = 5:3, then find the perimeter of ΔABC.
If I is the incentre of ΔABC , if ∠ BAC = 700 , then what is the measure of ∠ BIC?
In a circle, the chord AB is 12 cm, and the perpendicular from the center O to the chord AB bisects it at point P. If OP = 5 cm, what is the radius of t...