Question
A can do a work in 16 days and B can do the same work in
12 days. How long will it take for A and B to complete the work if they work together?Solution
Aβs rate of work = 1/16, Bβs rate of work = 1/12. Together, their rate of work = (1/16 + 1/12) = (3 + 4) / 48 = 7 / 48. Therefore, the time taken to complete the work = 48 / 7 = 6.86 days.
Ctrl + S shortcut key is used for:
Which port number is commonly used by the HTTPS protocol for secure web communication?
What is the fourth layer in the OSI model?Β
Interpolation is made possible by a principle called
An E-mail address is composed of :
The address used to uniquely locate a webpage on the Internet is called:
Which device connects multiple networks and forwards packets?
Which is not a storage device?
Which device is used to convert digital signals to analog signals?
Which CPU internal memory is the absolute fastest?