Question
A can do a job in 24 days, while B can do the same job
in 30 days. They started the work together, but A left after 6 days. In how many more days will B finish the remaining work?Solution
Work done by A and B in 1 day = 1/24 + 1/30 = 3/40 Work done in 6 days = 6 × 3/40 = 9/20 Remaining work = 1 – 9/20 = 11/20 Remaining work is to be done by B, taken time = 11/20 ×30 = 16.5 days
A device that connects network with different protocols?
In RDBMS architecture, what is the role of the Buffer Manager?
Which type of neural network architecture is specifically designed to process data with a variable-length sequence?
Which command is used to change the permissions of a file in a Unix/Linux system?
Which of the following power plants is known for being a renewable energy source that utilizes the Earth's internal heat?
In the standard normal distribution (mean = 0, standard deviation = 1), what is the probability that a random variable falls within one standard deviati...
In the Entity-Relationship (ER) model, what does an entity represent?
The SI unit for measuring time is:
The configuration, in which no difference between memory and I/O devices is seen by the CPU, is referred to as ___.
Which of the following statements about MOSFETs is true?