Start learning 50% faster. Sign in now
Work done by A and B in 1 day = 1/24 + 1/30 = 3/40 Work done in 6 days = 6 × 3/40 = 9/20 Remaining work = 1 – 9/20 = 11/20 Remaining work is to be done by B, taken time = 11/20 ×30 = 16.5 days
What this code line say?
int (*p )(char *a)
What is the maximum number of different Boolean functions involving n Boolean variables?
data mart
Virtual memory allows for the efficient management of:
Which component amplifies or switches electronic signals and is a fundamental building block of modern electronic devices?
Which data structure is used for implementing breadth-first search (BFS) algorithm?
Which data structure follows the "last-in, first-out" (LIFO) principle?
Which of the following models used for software reliability
Which protocol is used to retrieve email from a remote server?
Ethernet operates in which layer/s?