Question
A red JCB machine can complete the excavation of a field
in 10 days, while a green JCB machine can accomplish the same task in 15 days. If both machines operate simultaneously for 4 days, what fraction of the field will they have excavated together?Solution
Let total work = 150 units Amount of work done by Red JCB machine in one day = 150/10 = 15 units Amount of work done by Green JCB machine in one day = 150/15 = 10 units Amount of work done by both machine in one day = 15 + 10 = 25 units Time taken by both machines together to complete the work = 150/25 = 6 days So the part of work done by both the machines together in 4 days = 4/6 = 2/3 Hence, option d.
Who attends seminar in morning on Tuesday?
Six boxes, T, U, V, W, X and Y are kept one above the other (not necessarily in the same manner). There are four box between T and U. There are two boxe...
Who among the following likes FIT?
On which of the following days the English exam was held?
- Six boxes S, T, U, V, W and X kept one above another from bottom to top. Box X is two boxes above Box W. Box V is immediately above Box T. Two boxes are ke...
Who conducts workshop on Saturday?
Who among the following teaches ‘Chemistry’
Which of the following box is kept immediately above box A?
___ lives immediately above D in the same type of flat.
How many such digits are there in the number 86732459 each of which remained unchanged as when the digits are arranged in descending order within the nu...