Question
Working alone, 'C' can complete a job in 30 days. 'D'
takes 20% less time than 'C' to finish the same job. Calculate the percentage of work done by 'C' and 'D' together in 4 days.Solution
ATQ, Time taken by 'D' alone: 0.8×30=24 days Total work: LCM of 24 and 30 = 120 units Efficiency of 'C': 120/30=4 units/day Efficiency of 'D': 120/24=5 units/day Combined efficiency of 'C' and 'D': 4+5=9 units/day Work done in 4 days: 9×4=36 units Percentage of total work done: (36/120)×100=30 Therefore, 'C' and 'D' together complete 30% of the work in 4 days.
Which of the following correctly defines the "RotoDynamic Pumps"
FRI ( forest research institute ) was established is located at
Sodium hypochlorite is used:
What is the recommended intercropping method for Bengal Gram cultivation?
The alcohol (Ethanol) is used for the precipitation ofÂ
Which new breed evolved through the grading up local buffalo of coastal andhra pradesh with murrah over generation     Â
Which non-reducing disaccharide is hydrolysable by acids to glucose with difficulty and is stored as a reserve food supply in an insect's hemolymph?
Blade hoe is primarily used for:
What is the term for the measurement of a tree's cross-sectional area, which is typically determined by measuring the diameter of the tree trunk at brea...
Gestation period of Sheep