A can complete 15% of the work in 20% of the allotted
time. A and B worked for the entire period of the allotted time and the work was completed on time. What portion of the work was done by B?Solution
Let the total time taken by them be 100 minutes. So, Â 20% of 100 minutes = 20 minutes Now, 15% of work is completed in 20 minutes by A 3% of work is completed in 4Â minutes by A 75% of work is completed in 100Â minutes by A If A can complete 75% in 100 minutes, then, B will complete the remaining portion i.e. (100 - 75) = 25% Â 25% of the work was done by B.
What is the term used to describe the level of population density at which control measures should be implemented to prevent a rising pest population fr...
Which one of the following hormones sclerotizes the newly formed cuticle?
Planting of marigold as trap crop in Tomato and Cotton is used to attract to_______
Which pest is identified by the ‘honeydew’ it secretes, which often leads to the development of sooty mold on plant leaves ?
Larvae of _____________Â causes damage in redgram by webbing together flowers, pods and leaves with frass often on pods and shoot tips.
Which of the following insects is the carrier of grassy stunt pathogenic virus?
Tassar silk is majorly grown in
The type of antennae found in Honeybee are………………
The type of glands associated with the insect's head appendages is primarily responsible for silk production in certain insect larvae is
The component of the insect's body wall primarily functions as a multifaceted shield, offering protection against physical injury, water loss, and the e...