Question
P’s 3 days work is equal to Q’s 4 days work. If P
and Q together can complete the work in 32 days then how much time Q will take to complete 75% of the work?Solution
Ratio of efficiency of P and Q = 4:3 Let the efficiency of P and Q be 4x and 3x units per day respectively. Total work = 7x × 32 = 224x units Required time = (0.75 × 224x)/3x = 56 days
In an experimental arrangement of a Fresnel's biprism, monochromatic light of wavelength 2. is used to produce interference fringe pattern. On introduc...
Which of the following is an alpha particle which is emitted in radioactivity?
A copper block of mass 3 kg is heated in a furnace to a temperature of 450°C and then placed on a large ice block. Find the maximum amount of ice that...
Which graph represents uniform motion?
What type of lens is used to correct myopia (shortsightedness)? Â
The part of the eye having the largest refractive index is -
The ratio of the total distance traveled by a body to the total time taken is its:
The time period of a simple pendulum depends on — Â
When a passenger in a moving bus is suddenly thrown forward when the bus stops, this is explained by:
What device is used to measure electric current? Â