Question
βAβ and βBβ can do a piece of work in 10 days
and 15 days, respectively. They started working together but βAβ left after 3 days. Find the time taken by βBβ to complete the remaining work.Solution
Let total amount of work be 30 units (LCM of 10 and 15). Efficiency of βAβ = 30/10 = 3 units/day Efficiency of βBβ = 30/15 = 2 units/day Amount of work done by βAβ and βBβ together in 3 days = (3 + 2) Γ 3 = 15 units Time taken by B to complete remaining work = {(30 β 15)/2} = 7.5 days
Which data analytics technique is suitable for handling missing data points in a dataset?
The dynamic memory allocation is the memory allocation done at the _________.
Which of these can be overloaded?
Which of the following is a valid token in lexical analysis?
What does a "Shared Lock" in a DBMS locking protocol allow?
Β
Consider a 4-way set associative cache consisting of 128 lines with a line size of 64 words. The CPU generates a 20-bit address of a word in main memor...
In dynamic programming, what is memoization?
What is the minimum no. of variables/ features required to perform clustering?
What is the basic component of an electronic circuit that restricts the flow of current?
When designing a sequential circuit, what is the purpose of flip-flops or latches?