Question
The time taken by ‘A’ to build a wall alone is 60%
more than the time taken by him to build it along with ‘B’. ‘B’ will take how much percent more time to build the same wall than the time taken by him to build it along with ‘A’?Solution
Let the work ‘A’ and ‘B’, can do in 1 day be ‘a’ units and ‘b’ units, respectively. Let they takes ‘p’ days to build the wall, together Therefore, Total work = (a + b) × p units …….. (1) According to the question, Time taken by ‘A’ to build the wall alone = 1.6p days Therefore, total work = 1.6p × a units….. (2) From equation (1) and (2), we get 5b/3 = a Therefore, total work to be done = (a + b) × p = 8bp/3 units Time taken by 'B' to build the wall = 8bp/3b = 8p/3 days Therefore, required percentage = (8p/3 – p)/p} × 100 = 166.66% more time
Under the provision of section 105-A of the Code of Criminal Procedure, 1973, 'Identifying includes:-
Which international conference is referenced in the preamble of the Environment (Protection) Act, 1986 as the basis for its enactment?
Where a bill of exchange is drawn in a set of six, how many of them need to be proved?
Formal Certificate of dishonor issued by the Notary Public to the holder of Bill or Note on his demand, is called as:
Who is eligible to file a complaint with the District Commission regarding goods or services under the Consumer Protection Act?
Which of the following is an exception to S.132?
As per LLP act, body corporate includes -
With reference to Section 213 of the Code of Criminal Procedure, 1973- read the following illustration and select the correct option.
'A' is a...
Under Section 431 BNSS, when an appeal from acquittal is filed, the High Court may:
 Under Section 43(3), the police officer may use handcuffs while arresting a person—