Start learning 50% faster. Sign in now
Let the total work be 12 units. {LCM (12 and 6)} So, efficiency of ‘A’ = (12/12) = 1 units/day So, efficiency of ‘B’ = (1/2) = 0.5 unit/day Efficiency of ‘B’ and ‘C’ together = (12/6) = 2 units/day So, efficiency of ‘C’ = 2 – 0.5 = 1.5 units/day So, time taken by ‘C’ to finish the work alone = (12/1.5) = 8 days
What is the square root of 5476?
Two times a number, added to the square of that number, gives 3. What could be the possible answer for this number?
A horse is tethered to a peg with a 28 metre long repeat the corner of a 45 metre long and 25 metre wide rectangular grassfield. What area of field does...
Find the square of 572
What is the smallest natural number that should be added to 1030 so that the square root of the sum is a natural number?
Find the square root of 0.0324.
Find the Square root of √1681
If the average of two numbers is 13 and the square root of their product is 12, then the difference between the numbers is:
Find the square of 362
Find the Square root of √14641