βAβ alone can do some work in 10 days. βBβ and
βCβ together can do the same work in 12 days. If βBβ is half as efficient as βAβ, then find the time taken by βCβ to complete the work alone.Solution
Let the total work be 60 units. {LCM (10 and 12)} So, efficiency of βAβ = (60/10) = 6 units/day So, efficiency of βBβ = (6 x 0.5) = 3 unit/day Efficiency of βBβ and βCβ together = (60/12) = 5 units/day So, efficiency of βCβ = 5 β 3 = 2 units/day So, time taken by βCβ to finish the work alone = (60/2) = 30 days
In a competition between two participants, one participant secured 55% of the total points and won by a margin of 3,300 points. What was the total numbe...
A boat can travel 30 km downstream in 2 hours and return upstream in 3 hours. What is the speed of the boat in still water?
Below given is a wrong number series & 'p' is the replacement of the wrong term.
1360, 1362, 1367, 1380, 1400
I. βpβ is a prime number...
The lengths of two sides of a parallelogram are 3 cm and 10 cm. What is the sum of the squares of the diagonals of the parallelogram?
If total lakes in X are 25% more than total parks in P and total parks in X are 50% more than total parks in R, then find total parks and lakes in X.
A man allocates 12%, 18%, and 20% of his salary to his three children, P, Q, and R, respectively. The children spend 50%, 60%, and 56% of their received...
A and B together can complete a task in 12 days. A alone can complete the task in 20 days. In how many days can B alone complete the task?
From a point 30 m away from the base of a building, the angle of elevation to the top of the building is 60Β°. Find the height of the building.
The following table shows the marks obtained by five students in three subjects:
24.5% of 400 + 528 of 12.5 Γ· 11