Question
A work can be completed by βAβ and βBβ, alone in
18 days and 10 days, respectively. Find the number of days taken by βCβ to complete the same work alone if βAβ, βBβ and βCβ together can complete the whole work in 5 days.Solution
Let total work = 90 units (LCM of 18 and 10) Efficiency of βAβ = (90/18) = 5 units/day Efficiency of βBβ = (90/10) = 9 units/day Combined efficiency of βAβ, βBβ and βCβ = (90/5) = 18 units/day Efficiency of βCβ = 18 β (5 + 9) = 4 units/day Required time taken = (90/4) = 22.5 days
The oxidation of one molecule of NADH in mitochondria results in formation of
Most critical stage of irrigation in wheat crop is:
Which stage does adulteration takeΒ place in ?
Physical condition of soil resulted due to tillage is
Match List I with list II
Rotation involving Stylosanthus hamata & Sorghum is an example of
Which of the three geographic races of rice has tall stature, weak stem, droopy leaves, low productivity and irresponsive to high inputs?
Which of the following is not a bottom up technique for the synthesis of nanoparticles?
Cultivation of crops in areas receiving annual rainfall more than750 mm but less than 1150 mm is known as
Total soluble solids are measured by: