Ratio of efficiencies = 5 : 4 : 3 Ratio of time required = 1/5 : 1/4 : 1/3 = 12 : 15 : 20 Suppose Aman, Rahul and Pratik complete the work in 12x, 15x, 20x days respectively. Then, 1/(12 x) + 1/( 15 x) + 1/( 20 x) = 1/10 (5x+4x+3x)/60x = 1/10 12/60x = 1/10 x = (12×10)/60 = 2 days Hence, the fastest worker Aman can complete the work = 12x = 12 × 2 = 24 days
The volume and height of a cylinder are 2662 cm3 and 7 cm. Find the radius of the cylinder.
A rectangular hall has a length of 32 meters and a perimeter of 96 meters. If the entire hall is to be carpeted at a cost of Rs. ...
The weight of a cubic metre metal is 1215 kg. It is melted and cast into a square rod of 9m length. A solid cube of maximum size is taken out from one e...
On a rectangular wall of length 35 metres and height 30 metres, there is a window in the shape of triangle surmounted on a square. If the base of triang...
If the ratio of the heights of two cones is 3:2 and the diameters are in the ratio 5:6, what is the ratio of their volumes?
The lateral surface area of frustum of a right circular cone, if the area of its base is and the diameter of circular upper surface is 4 cm and slant he...
A square has an area of 289 cm². The rectangle's breadth is 20% more, and its length is 50% more than the square's side. What is the area ratio of the ...
If 35 grams of sugar is further added to a 20 percent sugar solution, the solution then becomes a 36 percent sugar solution. What was the initial quanti...
Find the area of sector of a circle whose radius is 21 cm and angle subtended by the sector at centre of circle is 45 ° .