Question
A, B, and C together can do a work alone in 12 days, 18
days, and 54 days respectively. A alone starts the work and work for 3 days and leaves the work, then B alone does the work for 8 days and leaves the work. If remaining work is done by C alone then for how many days has C worked?Solution
Total work = LCM of 12, 18 and 54 = 108 units Unit per day of A = 108/12 = 9 Unit per day of B = 108/18 = 6 Unit per day of C = 108/54 = 2 Units of work done by A in 3 days = 9 Γ 3 = 27 units Units of work done by B in 8 days = 8 Γ 6 = 48 units Remaining work = 108 β (27 + 48) = 33 units So, C has worked for 33/2 = 16.5 days
If the average of two numbers is 13 and the square root of their product is 12, then the difference between the numbers is:
What is the smallest natural number that should be added to 1030 so that the square root of the sum is a natural number?
A horse is tethered to a peg fixed at one corner of a rectangular grass field measuring 45 metres in length and 25 metre...
Determine the value of (0.88)2Β
Find the square root of 0.0324.
Two times a number, added to the square of that number, gives 3. What could be the possible answer for this number?
Find the Square root of β14641
Calculate the lateral surface area of a right circular cone having a radius of 5 cm and a height of 12 cm.
Find the value of β 474552
Solve the following :-